COMPLETED PROJECT

final

Installation 4 Units Headstock, Extension Spindle And Actuator @ Air Selangor Batu Estate Pump House

final

Shutdown Works Installation 5 Units Of DN1500 VAG Gate Valve, and 1 Unit Of DN1800 Flowmeter c/w Others Related Works @ Air Selangor Kepong Estate Pump House

Final

Installation 5 Units DN1500 VAG Butterlfly Valve c/w Others Related Works @ Air Selangor Kepong Estate Pump House

final

Installation 1 Unit DN2000 Flowmeter c/w Others Related Works @IWSS Jugra Banting

final

Installation 37 Units Rotork Actuator and 4 Units Auma Actuator c/w Gearbox and Cabling Work SMART Project @ Air Selangor Semenyih 2 WTP

final

Installation Of Gate, Post Fence at Robert Bosch Semiconductor Manufacturing Penang

final

Installation 4 Units Flat Seat Valve DN250 @ Air Kelantan Loji Air Remah, Tanah Merah

final

Installation Papan Baffle@ Loji Air Karak , Pahang

final

Servicing 4 Units Gearbox For DN1800 Butterfly Valve @ Semenyih Water Treatment Plant

final

Supply Labour And Tools For Replace Work Of Butterfly Valve Line 4 And 6 At Pump House Bukit Gasing Wilayah Petaling

final

Replacement Of Pump No.2 And Other Related Works At Bukit Permata Pump House, Gombak Region

final

Kerja -Kerja Pengantian Sistem Auto Desludging, Peralatan Pnuematic Serta Piping Di Loji Air Bertam.

FINAL

Kerja Pemasangan Injap Kawalan Masuk (Altitude Valve) Di Kolam Terminal Bangi 3mg, Wilayah Hulu Langat

final

Replacement 72 Units Actuators, Rectification Of Sand Ejector System At Semantan Intake, Pahang

final

Service 12 Units Penstock 3000mmx3000mm @ Semantan Intake, Pahang

final

Installation Of New Lamella Plate @ Merlimau WTP

final

Piping Work Repair @ Kahang WTP , Johor

final

Installation 4 Units New Actuator And Other Related Work @ Sg Chin Chin WTP , Melaka

final

Installation Stoplog At Empangan Durian Tunggal , Melaka

Final

Installation 1 Unit Actuator And Other Related Works @ Sekinchan, Selangor

sabak

Replacement 1 Unit DN700 Butterfly Valve c/w Installation new Rotork Actuator @ BRH Reservoir Wilayah Sabak Bernam

final

Replacement 1 Unit Flowmeter DN200@ Loji Air Selisek

final

Replacement Actuator I-Tork @ Pulau Besar , Melaka

final

Shutdown Work For Replacement 4 Unit Pipe DN300 @ Kolam Bukit Jelutong

final

Shutdown Work For Replacement 1 Unit DN500 Recoile Check Valve & Butterfly Valve @ Pump House Sabak Bernam

FINAL

Shutdown Work For Replacement 1 Unit DN1000 Flowmeter @ Merlimau WTP, Melaka

final

Replacement 4 Units DN250 Gate Valve @ Cenviro Kualiti Alam, Sendayan

final

Inspection 6 Units Bandscreen @ Semantan Intake Karak

ktu

Proposed Extension Of New Administration Building And Renovation Works For Existing Building For Certifying Agency (CA) Terengganu at Muara Utara STP (KTU185), Terengganu Darul Iman

final

Installation Penstock Saiz 1595mm x 1600mm @ Bandar Suleiman

FINAL

Installation HDPE Flap Gate

1

Supply manpower for Installation of Mechanical Rake Screen

FINAL

Supply Manpower for Fabrication Structure Works